πŸ“ Serving All 5 NYC Boroughs + Long IslandπŸ“ž (917) 735-8324info@newyorkestimators.us
βœ“ NYC Licensed & Insured⚑ 48-Hour Turnaround
Expert drywall estimating services NYC | New York Estimators
CSI Division 09 Β· Metal Framing and Drywall Β· UBC Local 1974 Carpenters Prevailing Wage

Drywall Estimating Services In NYC

Detailed drywall and interior framing cost estimates for in New York City contractors and GCs. Full Division 09 scope, metal stud framing, drywall layers, fire-rated assemblies, ACT, and specialty ceilings, with UBC Local 1974 Carpenters NYC prevailing wage applied.

★★★★★ 4.9/5 from 60+ across the five boroughs contractors

Call us: +1 (646) 555-0192  ·  Mon–Fri 8am–6pm ET

CSI Division 09 Full Scope
UBC Local 1974 Carpenters Prevailing Wage
Fire-Rated Assemblies (UL and GA Listed)
NYC Buildings Code Compliance
48, 72 Hour Delivery
Why It Matters

Drywall Estimating throughout New York Projects Requires Assembly-Level Accuracy

NYC drywall estimating must account for multi-layer fire-rated assemblies, UBC Local 1974 Carpenters prevailing wage, here in Manhattan Buildings Code corridor and shaft requirements, and acoustical performance standards that drive board type and stud gauge selection on every project.

Board Type and Layer Count

NYC commercial drywall is estimated by board type (1/2" standard, 5/8" Type X fire-rated, moisture-resistant, impact-resistant, abuse-resistant) and by layer count (single-layer vs. multi-layer fire-rated assemblies). The for NYC projects Buildings Code and Fire Code specify required assemblies for corridors, stair enclosures, shaft walls, and tenant demising walls.

Fire-Rated Assembly Compliance

UL-listed and GA-listed fire-rated drywall assemblies (1-hour, 2-hour) are required throughout NYC commercial and residential construction. Our drywall estimates identify each wall type's fire rating from the architectural wall type schedule and apply the correct assembly, typically 2 layers of 5/8" Type X for a 2-hour corridor wall, with the correct studs, fastener schedule, and acoustic batt where required.

UBC Local 1974 Carpenters Rate

Drywall and interior framing labor in New York City is performed by UBC Local 1974 Carpenters (also known as New York City District Council of Carpenters, depending on scope). Our drywall estimates apply the current across New York City Comptroller prevailing wage rate for carpenter journey workers and foremen, not national union averages that significantly understate actual NYC labor cost for drywall installation.

Metal Framing by Gauge

Metal stud framing is estimated by stud gauge (20 ga, 18 ga, 16 ga) and size (3-5/8", 6", 8") with height factor adjustments for walls over 10 feet that require heavier gauge studs per in the city Buildings Code structural requirements. Track quantities are measured separately for floor and ceiling plates, and bridging and bracing are included for tall walls.

ACT and Specialty Ceilings

ACT (acoustical ceiling tile) systems are measured by SF with grid components (main tees, cross tees, wall angle, hanger wires) counted per room layout and ceiling height. GWB soffits, curved drywall ceilings, and suspended drywall systems are measured and priced separately with UBC Local 1974 Carpenters labor applied to the specific installation type.

Finish Level by Room

Joint treatment finish level (GA-214 Level 1 through Level 5) affects labor cost. NYC commercial office, healthcare, and retail projects typically require Level 4 or Level 5 finish in occupied spaces. Our drywall estimates apply finish level by room type as specified in the room finish schedule, rather than a single blended rate across all spaces.

Division 09 Scope

New York Drywall Estimating, What We Cover

Full CSI Division 09 drywall and interior construction estimating for in New York City commercial and residential projects.

Division 09 20

Metal Framing

Metal stud wall framing and metal furring by gauge and stud size. Floor and ceiling track, bridging, and bracing. Includes shaft wall framing (C-H and I-stud assemblies) for elevator and mechanical shafts.

Division 09 29

Gypsum Board

Drywall by board type, thickness, and layer count. Standard, fire-rated Type X, moisture-resistant, impact-resistant, and exterior sheathing. All quantities measured by wall and ceiling surface area with openings deducted.

Division 09 51

Acoustical Ceilings

ACT ceiling tile by type and grid system. 2x2 and 2x4 tile sizes. Standard and seismic-braced suspension systems for NYC Buildings Code compliance. Specialty acoustical ceiling clouds and baffles.

Division 09 60

Flooring and Painting

VCT, LVT, carpet, and ceramic tile quantities by room. Painting by surface type and finish coat count. All Division 09 finish trades priced with current across the five boroughs prevailing wage for the applicable trade jurisdiction.

Our Process

Drywall Estimating Services NYC, How We Work

1

Upload Architectural Drawings

Send PDF architectural floor plans (all floors), reflected ceiling plans, wall type schedule with UL or GA assembly references, room finish schedule, and Division 09 specifications.

2

Assembly-Level Takeoff

Each wall type is measured separately by its assembly designation, single-layer, multi-layer, fire-rated, from the wall type schedule. ACT is measured by room grid layout. Specialty ceiling conditions are measured individually.

3

throughout New York Prevailing Wage Pricing

All labor is priced with UBC Local 1974 Carpenters NYC prevailing wage. Materials are priced from current here in Manhattan drywall supplier pricing. Stud gauge, board type, and finish level are all reflected in the unit costs applied.

4

Drywall Estimate Delivered

Delivered as a structured Division 09 estimate by scope section, framing, drywall, ACT, specialty ceilings, flooring, painting, with quantities, labor hours, and material costs clearly separated for subcontractor and GC review.

Technical Depth

NYC Drywall Estimating, Code and Standards Context

Drywall estimating services in for NYC projects operate under NYC Buildings Code (based on the IBC) for fire-rated assembly requirements, the across New York City Fire Code for sprinkler and compartmentalization requirements that affect wall rating, and ASTM standards for gypsum board products (ASTM C1396 for gypsum board, ASTM C645 for metal framing). GA-214 (Levels of Gypsum Board Finish) governs joint treatment level specifications used throughout the five boroughs.

UBC Local 1974 Carpenters (New York City District Council of Carpenters) covers drywall installation, metal framing, and ACT hanging under their jurisdiction in Manhattan, Brooklyn, Queens, the Bronx, and Staten Island. NYC Comptroller prevailing wage rates for the carpenter jurisdiction apply to all commercial drywall work where prevailing wage is required, including public projects and many private projects with public financing through HPD or HDC.

  • UBC Local 1974 Carpenters in the city prevailing wage (drywall and framing)
  • NYC Buildings Code fire-rated assembly requirements
  • UL-listed and GA-listed assembly references
  • GA-214 Levels of Gypsum Board Finish (Level 1 through Level 5)
  • ASTM C1396 gypsum board and ASTM C645 metal framing standards
  • in New York City Buildings Code seismic bracing requirements for ACT (Section 1803)
  • NYC HPD Master Guide Specification Division 09 for affordable housing

About Our Estimating Team: Our across the five boroughs CSI Division 09 drywall and framing estimates are prepared by AACE-certified estimators with 10+ years of experience on DOB-filed commercial projects across all five boroughs. We apply current prevailing wage schedules from the NYC Comptroller and use industry-standard software for every takeoff.

ItemTypeUnitSample Qty
Metal stud 3-5/8"20 ga at 16" OCLF12,400
GWB single layer5/8" Type XSF48,000
GWB 2nd layer5/8" Type X (2-hr)SF18,600
Shaft wall framingC-H and I-studLF3,200
ACT 2x2 tileStandard gridSF24,000
Acoustic batt3-1/2" in wallsSF22,000
Client Results

Drywall Estimating Services In New York, Client Results

β˜…β˜…β˜…β˜…β˜…

"The drywall estimate for our 18-floor Manhattan office build-out broke out each wall type by its fire rating and board type, 1-hour, 2-hour, and non-rated partitions all separately quantified. That's the breakdown our drywall sub needed to verify his bid. No other estimator gave us that level of detail."

J. Ramirez
Project Manager, Manhattan commercial GC
β˜…β˜…β˜…β˜…β˜…

"Their throughout New York drywall estimating caught that the architectural wall type schedule called for 20 ga studs on walls over 14 feet. We had priced 20 ga throughout, their estimate correctly applied 18 ga for the tall walls per the Buildings Code structural note. Caught that before bid submission."

L. Caruso
Estimator, Brooklyn drywall contractor
β˜…β˜…β˜…β˜…β˜…

"Used their drywall estimating services for a 240,000 SF Queens healthcare facility with complex fire-rated corridor and shaft requirements. Every UL assembly was identified and correctly quantified. UBC Local 1974 labor rates were applied throughout. Estimate was back in 72 hours."

N. Patel
Senior PM, Queens healthcare developer
Coverage

Drywall Estimating In New York, Project Types

🏒 Commercial Office
πŸ₯ Healthcare and Medical
🏬 Retail Build-Out
🏫 Educational
🏠 Residential High-Rise
🏠 Affordable Housing (HPD)
🏨 Hotel Interiors
πŸ— Mixed-Use Development
πŸ“ Manhattan
πŸ“ Brooklyn
πŸ“ Queens
πŸ“ The Bronx
Common Questions

Drywall Estimating Services New York, Common Questions

What does drywall estimating services in NYC cover?
Drywall estimating services in here in Manhattan cover the full CSI Division 09 interior scope, metal stud framing by gauge and spacing, drywall by layer count and board type, ACT ceiling systems, specialty ceilings, GWB shaft walls, exterior sheathing, joint treatment, and all finish levels. Labor is priced with UBC Local 1974 Carpenters NYC prevailing wage rates.
How is drywall measured for for NYC projects commercial projects?
Drywall for NYC commercial projects is measured in square feet of surface area by board type, with separate quantities for single-layer and multi-layer assemblies. Metal stud framing is measured in linear feet of track (floor and ceiling) and stud by gauge and height, with stud layout verified against the partition plan. All quantities are taken off from architectural drawings using Trimble On-Screen Takeoff or PlanSwift.
Do you estimate fire-rated drywall assemblies for across New York City Buildings Code compliance?
Yes. NYC Buildings Code requires specific fire-rated drywall assemblies for corridor walls, stairway enclosures, shaft walls, and rated area separation walls. Our drywall estimates identify each wall type's fire rating and apply the correct UL-listed or GA-listed assembly with the correct quantities and details.
Can you estimate ACT and specialty ceilings for in the city projects?
Yes. ACT and specialty ceiling systems are part of our NYC drywall estimating services. ACT is measured by SF with grid system components counted by room layout. Specialty ceilings including GWB soffits, curved GWB ceilings, and suspended drywall systems are measured and priced separately with UBC Local 1974 labor rates applied.
What drawings do you need for drywall estimating in in New York City?
We work from architectural floor plans (all floors), reflected ceiling plans, wall type schedules with UL or GA assembly references, and room finish schedules. For fire-rated assemblies we also reference structural drawings to confirm shaft wall locations and stair enclosure extents. Division 09 specifications are used to verify board type, joint treatment level, and acoustic batt requirements.
How fast are drywall estimating services delivered for NYC projects?
Drywall estimates for across the five boroughs commercial projects up to 100,000 SF are typically delivered within 48, 72 hours from complete architectural drawing sets. Large or complex projects with many specialty ceiling conditions may require 72, 96 hours. Rush 24-hour service is available for projects with verified bid submission deadlines.
Get Started

throughout New York Drywall Estimate, Delivered in 48 Hours

Send your architectural drawings and Division 09 specifications. We'll deliver a complete drywall estimate with assembly-level quantities, UBC Local 1974 labor rates, and NYC market material pricing.

Request Drywall Estimate